국제
epa09530230 An aerial picture taken with a drone shows the construction site of a waterway across Vistula Spit in Skowronki village, northern Poland, 18 October 2021. An agreement on the construction of a waterway across Poland's northern Vistula Spit was signed on 04 October 2019 between the Maritime Authority in Gdynia and the Polish-Belgian NDI/Besix consortium, which will build the canal. The PLN 992 million (EUR 229 million) project will include a harbour on the Gdansk Bay side of the Spit, a waterway with a water gate across the Spit linking Gdansk Bay with the Vistula Lagoon, berthing areas on both sides of the Spit and an artificial island on the Vistula Lagoon. The new waterway is expected to give Poland direct access to the Baltic Sea from the Vistula Lagoon with omission of the Russian-controlled Strait of Baltiysk. EPA/Adam Warzawa POLAND OUT
저작권자(c)연합뉴스. 무단전재-재배포금지
연합뉴스 주요 뉴스
해당 언론사로 연결됩니다.
- 포스코 사내 성희롱 관련 2명 '정직' 처분
- 노르웨이의 유명 바다코끼리, 몰려드는 구경꾼에 결국 안락사 | 연합뉴스
- 이준석 "尹 '이 XX 발언', 윤핵관에 나 때리라는 지령 역할"
- 尹대통령 국정지지 28%대…유권자 3분의2 "잘못하고 있다"[KBS·MBC]
- 우상호 "어떤 당은 젊은 대표 이용해먹고 헌신짝처럼 버리더라"
- 이용수 할머니, 尹 경축사에 "역사·위안부 문제 한마디도 없어" | 연합뉴스
- 되풀이되는 조계종 '승려 집단폭행'…9년 전엔 적광스님 사건
- "술 먹고 한강 들어갔다" 강물 빠진 20대 실종…수색 중 | 연합뉴스
- 현대해상, 1년여전 "폭우 내리면 서울 강남 침수 위험" 경고 | 연합뉴스
- 동물보호단체 "홍준표 시장 의지로 칠성 개 시장 철폐하라"